BREMEN, Germany

Special solution for district heating

Project

  • District heating transfer station, Bremen

  • Customer: HKW Blumenthal GmbH

  • Project duration: 6 months

special solution
water treatment
pressure maintenance

Task:

  • Design and supply of a customised system for the external installation of the vessels, incl. FEM analysis and wind load calculations

Technical challenge:

  • Load distribution by means of a steel structure made of double T-beams

Special site conditions:

  • Installation of the vessels on a concrete cover above a large utility shaft

  • Compliance with the base plate hole pattern for precise positioning on a steel structure

Product solution:

  • 1 × Variomat Giga GH 140 S + GS 5,5 400/50

  • 1 × Variomat Giga GG 27.000 GY 0,5 b DN 100/6 BoB-R

  • 1 × Variomat Giga GF 27.000 GY 0,5 b DN 100/6 DUO

  • 1 × BoB Rohr 27.000 DN 80/16 adjustable

  • 1 × Servitec Lev. 160-4-S 90C

Special technical adaptations:

  • FEM analysis and wind load calculations for the external installation of the vessels

Achieved goals

  • Customised solution tailored to the customers specific requirements

  • Precise positioning of the vessels on a steel structure to ensure optimum load distribution

  • Development of a steel structure made of double T-beams for load distribution