Reflex offers products and solutions of all sizes and complexities.
Product solutions
Overview of our product solutions and their functions
Project solutions
Holistic solutions expertise from planning through to service
Reference sites
Overview of our global reference sites
Solutions & references
Product solutions from Reflex and SINUS
Project solutions
Reference sites
Solutions & References
Reflex offers products and solutions of all sizes and complexities.
Reflex City
The interactive Reflex City shows the whole world of Reflex.
Tools & Downloads
Reflex Solutions Pro
Everything you need to know about our dimensioning tool for Reflex and Sinus products
PROSINUS®X
Everything you need to know about our Sinus product configurator
Documents and videos
Every document download and video at a glance
Reflex Solutions Pro
PROSINUS® X
Documents & videos
About Reflex
About Reflex
What is our back story, what drives us, what do we stand for?
Trade fairs & events
We are pleased to be able to welcome you to our events in person once again this year.
Company quality
Overview of independently certified Reflex and SINUS quality.
About Winkelmann Building+Industry
Winkelmann Building + Industry is a business unit of the Winkelmann Group.
About Reflex Winkelmann GmbH
Overview of our current events
Reflex company quality
About Winkelmann Building+Industry
Region/language
Project
Heating Plant
User: Gateshead Council
local heating network
heating
separation, pressure maintenance, skid
Performance parameter
System volume: appr. 660.000 Liter
Power: 22,5 MW
Task
Reflex was commissioned to create a robust, customized solution to facilitate a district energy network and Combined Heat & Power (CHP) Centre in the Gateshead Quays area. Due to on site space constraints, the specification demanded a great deal of flexibility in the pressurisation maintenance station manufacturers approach. The task was to create a solution which could not only accomodate the system heat load but to also satisfy the space restictions within the plant room
Product solution
1 x Variomat Giga GS 1.1, control unit
1 x Variomat Giga hydraulic module
1 x 8,000 litre Reflex basic vessel
3 x 8,000 litre Reflex secondary vessels
1 x extension module
4 x diaphragm rupture detector
1 x Servitec special system 90-4
1 x skid base incorporating all but the 8,000 litre vessels
1 of 1
Achieved goals
Creating a customized solution including a packaged pressure maintenance station/ vacuum degasser and specific vessels resulted in lower installation costs and a more efficient solution. Residents in the area will be able to enjoy reduced exposure to Carbon Reduction Commitment (CRC) and Climate Change Levy.
On-going heating plant maintenance, servicing and replacement costs will be reduced
An estimated 400 homes and 6 public buildings will benefit with capacity to significantly increase the network in the future.