Project

computer centre
cooling
pressure maintenance, degassing

Task

  • Dynamic pressure maintenance and degassing for a Nordic data centre

Product solution

3 skid solutions in total:

  • 1x skid for a 2.4 MW heating system—Skid 2.0 x 2.0 m

  • 1x skid for a 3.0 MW glycol system—Skid 2.5 x 2.0 m

  • 1x skid for a 256 kW de-icing system—Skid 1.5 x 1.5 m

Achieved goals

  • The system runs safe and smoothly. The cold climatic conditions were perfeclty met and have been eliminated as disrupting factors.