Reflex offers products and solutions of all sizes and complexities.
Overview of our product solutions and their functions
Holistic solutions expertise from planning through to service
Overview of our global reference sites
The interactive Reflex City shows the whole world of Reflex.
Everything you need to know about our dimensioning tool for Reflex and Sinus products
Everything you need to know about our Sinus product configurator
Every document download and video at a glance
What is our back story, what drives us, what do we stand for?
We are pleased to be able to welcome you to our events in person once again this year.
Winkelmann Building + Industry is a business unit of the Winkelmann Group.
Four-star hotel
240 comfortable rooms
7 floors
Haustechnik Projekt GmbH (HTTP), Managing Director Frank Nikolaiczik
Output: 800 KW
Dynamic pressure maintenance, degassing and heating/cooling water manifolds with integrated low loss headersProduktlösung
1 x Servitec 60 vacuum spray-tube degassing
1 x SINUS HydroFixx 280/320, manifold
1 x Exdirt DN 80 dirt and sludge separator
1 x Variomat 2-1 / 60 pressure maintenance station
1 of 1
No post-ventilation of the heating and cooling circuits
Since the solution has been put into operation, it has not been necessary to enter the hotel rooms to remove air from the system
Time and costs have been saved
If degassing of the heating and cooling circuits had not been provided, the system would already have needed to be vented 2 or 3 three times