Reflex offers products and solutions of all sizes and complexities.
Product solutions
Overview of our product solutions and their functions
Project solutions
Holistic solutions expertise from planning through to service
Reference sites
Overview of our global reference sites
Solutions & references
false
Project solutions
Reference sites
Solutions & References
Reflex offers products and solutions of all sizes and complexities.
Reflex City
The interactive Reflex City shows the whole world of Reflex.
Tools & Downloads
Reflex Solutions Pro
Everything you need to know about our dimensioning tool for Reflex and Sinus products
PROSINUS®X
Everything you need to know about our Sinus product configurator
Documents and videos
Every document download and video at a glance
Reflex Solutions Pro
PROSINUS® X
Documents & videos
About Reflex
About Reflex
What is our back story, what drives us, what do we stand for?
Trade fairs & events
We are pleased to be able to welcome you to our events in person once again this year.
About Winkelmann Building+Industry
Winkelmann Building + Industry is a business unit of the Winkelmann Group.
About Reflex Winkelmann GmbH
Overview of our current events
About Winkelmann Building+Industry
Region/språk
Project
Salt water and leisure pool/Charlottenhöhe district heating system
Client and operator: ENRW Energieversorgung Rottweil GmbH & Co.KG Rottweil/ Execution by Sülzle Kopf GmbH
Commissioning August 2017
swimming pool
heating
separation, pressure maintenance, skid
Task
Replacement of the existing pressure maintenance and upgrade to reflect best engineering practice.
Leveraging of the limited space and simplification of the hydraulic system
Maximum supply reliability and minimisation of failures
Product solution
2 x Variomat Giga GH 100, compound connection on 1200 x 1200 x 1700 skid
Variomat Giga GS 3 control module, Reflex Profibus-DP bus module
Variomat Giga GG 4000 primary vessel
4 x Variomat Giga GF 4000 secondary vessel
Exdirt D125 dirt separator with flange and Exferro magnet insert
Reflex G 400
1 of 1
Achieved goals
So far, operation has been trouble-free with no additional effort required. The twin system has already proven its performance capabilities.
Degassing commenced in continuous operation before now being performed at regular intervals, which saves even more energy. By the same token, the pressure maintenance pumps only switch on when needed (whereas they used to run continuously).