Meie Reflex BIM-platvorm annab MEP-planeerijatele ja paigaldajatele kiire juurdepääsu kohandatud BIM-objektidele Autodesk Revitis, IFC-s ja muudes vormingutes.
Klienditeeninduse tellimine
Reflex Solutions Pro
PROSINUS® X
Dokumendid ja videod
BIM@Reflex
Reflex
Reflex
Kust me tuleme, mis ajendab meid, mida me toetame?
Messid ja üritused
Me oleme rõõmsad, kui saame teid sellel aastal jälle isiklikult mõnel meie üritusel osalemisel tervitada.
Winkelmann Building+Industry
Winkelmann Building+Industry on Winkelmanni grupi äriüksus.
Reflex Winkelmann GmbH
Me aktuaalsete kavade ja ürituste ülevaade
Winkelmann Building+Industry
Regioon/keel
Project
Heating Plant
User: Gateshead Council
local heating network
heating
separation, pressure maintenance, skid
Performance parameter
System volume: appr. 660.000 Liter
Power: 22,5 MW
Task
Reflex was commissioned to create a robust, customized solution to facilitate a district energy network and Combined Heat & Power (CHP) Centre in the Gateshead Quays area. Due to on site space constraints, the specification demanded a great deal of flexibility in the pressurisation maintenance station manufacturers approach. The task was to create a solution which could not only accomodate the system heat load but to also satisfy the space restictions within the plant room
Product solution
1 x Variomat Giga GS 1.1, control unit
1 x Variomat Giga hydraulic module
1 x 8,000 litre Reflex basic vessel
3 x 8,000 litre Reflex secondary vessels
1 x extension module
4 x diaphragm rupture detector
1 x Servitec special system 90-4
1 x skid base incorporating all but the 8,000 litre vessels
1 of 1
Achieved goals
Creating a customized solution including a packaged pressure maintenance station/ vacuum degasser and specific vessels resulted in lower installation costs and a more efficient solution. Residents in the area will be able to enjoy reduced exposure to Carbon Reduction Commitment (CRC) and Climate Change Levy.
On-going heating plant maintenance, servicing and replacement costs will be reduced
An estimated 400 homes and 6 public buildings will benefit with capacity to significantly increase the network in the future.